Midway 4R-22L

We were hired for a team venture to survey the 4R-22L runway at Midway International Airport. Our portion of the contract was to survey the limits of the concrete runway, another company was tasked to do the outside. At first the client was set on mobile scanning but after noting the requirements and level of detail, we agreed on doing a stationary LiDAR scan of the entire runway, in order to keep the quality top notch and to capture a lot of detail.